Overview
Welcome to the Pulley STEM Classic! In this project, you will learn that pulleys are found in many everyday applications and often help provide a mechanical advantage.

Teaching tips
Welcome to the Pulley STEM Classic!
First, let's talk material. Here is a link to the material list. These materials are enough for 24 students working in 8 groups of 3.
There is an extra block pulley for each group. This is actually one extra than what students will need for the regular project. But, if you have students doing the optional extension, they may want more blocks available. Perhaps you could do the extension as a station and have only one group working on the pully extension at a time. This would give them plenty of materials.
As for the rope, I prefer using 550 paracord. I made a short video on how I like to fuse the ends. 100 feet of rope divided into 8 groups gives you 12.5 feet per group. I actually like to have twelve feet for the pulley part and six inches for tying the mass/weight to the end of the pulley. The carabiners are really helpful for this too. Paracord comes in many colors, but I prefer black because we are using chalk to measure out the amount of rope being pulled out.
For the horizontal support, I used a 2x2 furring strip. You can support this between two chairs or between two tables. For hooks, I recommend spacing them about 8" apart, 4" on each side of the center of the support. the 1/16" drill bit only needs to go in about 1/2 to 3/4" to drill the pilot hole.
Note: This project does cover some more advanced concepts like force, displacement, and work. While it would be great to introduce students to these topics, if you do not think these are age-appropriate, you can compare force needed to lift and length of rope for each pulley system.